View Project Detail, Download Proposal
You have 0 item in your Cart | Rs 0 | Checkout

Study on Just In Time Logistics (MBA Operations)

2600

MBA Project Type: Operations

ID: 1241

Description: The objective of this project is to examine the implementation of Just-In-Time Logistics methodology in TATA Motors. The JIT concept has been successfully developed and implemented in India. The study clearly shows how companies can work together in a harmonic and synchronized system meeting probably the most idealistic manufacturing principles (JIT) to produce the best quality product within the shortest time frame with minimum/no wastage and cost-effective to all parties. Careful production planning, cost-benefit analysis, adequate outsourcing plans and customer orientation are being praises as the key success factors of this amazing Just-In-Time concept.

Project Report Pages: 62

Can be used in: Operations

Project Cost: Rs 2600 / $ 52

Synopsis Cost: Rs 325 / $ 6.5

Delivery Time: Within 12 hours.

Support / Query : Call +91-9920329254 or Email info@readymadeproject.com or Contact Us

MBA Project ListClick to download complete MBA project list
Similar Projects